Forms, policies & guides

Policy for Rebuilding Sewer Pumps – Compensation from Town

Sewer Download (PDF, 206 KB)

Policy for Rebuilding Sewer Pumps – Compensation from Town – adopted Henderson-Nina Water System document (PDF, 1 page). Use the Download button for the official copy.

Text version (automatically extracted from the file – may contain scanning errors; the downloaded file is the official copy)
q Henderson/I.{ina Water System
 L394 Henderson HwY.
 Henderson, Louisi ana 7 0517
 Office: 337 -225-7458 Fax: 337 -228-7 686
 PWS #1099006

 POLICY FOR REBUILDING SEWER PUMPS

It is policy of the Henderson-Nina Water System, [nc. that a fee of $90.00 will be charged
to the Town of flenderson for each sewer pump rebuild. Pump rebuilding will be
performed at the sewer plant and the Town will provide att tools and materials needed.

APPROVED BY THE BOARD OF DIRECTORS DURII{G THE MONTHLY MEETING
 HELD ON NOVEMBER I7,2OI4

← Back to all documents